For Washington port districts · Updated October 2026

Website Accessibility for Washington Ports: What's Involved and What It Will Cost

What the rule asks of a port, what year one could cost, and where to start.

Port of [Your Port]

Accessibility report

Sample · a real small port's size; the findings are examples, not an actual scan

18

public pages

~7

templates to audit

117

documents in use

Examples of scan findings
  • Low-contrast text in the footer and on buttons
  • Images with no description
  • Links that only say "read more"
  • A contact form field with no label
  • Meeting agendas posted only as PDFs
A scan is a start. People using screen readers and keyboards find the rest.

Year one, a site this size

$6,700 to $16,700
A starting plan (example)
  1. Name the owner
  2. Turn new agendas and minutes into web pages; the 117 still in use set the document cost
  3. Small site: get a rebuild quote next to repair

Free, no obligation

Get a Free Report on Your Port's Website.

Tell me which port. Within one business day I'll send back a short report built for your port: its measurements, a free accessibility scan, and a starting plan, along with the materials from my October 22 talk.

Each report is built on request, so please allow one business day.

No matter the size

April 26, 2028

ADA Title II · WCAG 2.1 AA

Every Washington Port Has the Same Deadline.

Washington ports are special purpose districts, so the Justice Department's web rule under ADA Title II gives the largest port and the smallest the same date. The standard is WCAG 2.1, Level AA. It covers your website, the documents on it, and the outside systems you send people to, like a payment page or a moorage booking.

28 CFR 35.200, as amended by the interim final rule, 91 FR 20902 (April 20, 2026) · RCW 36.96.010.

This research is free to use. Success is every port meeting the requirement on deadline and under budget. I'm not a lawyer, so check the details with yours.

WCAG 2.1 AA in plain words

Accessibility is Organized Around Four Principles: POUR.

Accessibility means people can use your site however they use the web: with a screen reader, a keyboard instead of a mouse, magnification, or without sound.

Perceivable

People can take in the content through a sense they can use, not only sight.

Operable

Every interaction works without a mouse, with enough time to finish.

Understandable

Content and behavior are predictable, and errors are easy to recover from.

Robust

Built so assistive technology, present and future, can read it.

Before you buy anything

Accessibility is Five Stages, Not One Purchase.

1

Scan and Fix

Where most tools start.

2

Test With Real People

Screen readers, keyboard only.

3

Fix the Documents

The ones still in use. Archive the rest properly.

4

Build the System and Train

Templates, plus training for whoever posts.

5

Maintain

Regular scans, small fixes.

Keep in mind

You can outsource the software, not the responsibility. Payment pages, booking systems and online forms count, even when someone else runs them.

28 CFR 35.200(a).

A widget alone doesn't make a site compliant. In April 2025 the Federal Trade Commission fined one of these companies $1 million and barred it from claiming, without evidence, that its product makes a website compliant.

Federal Trade Commission final order, April 22, 2025.

A clean scan is a start, not a grade. Scanners catch part of the problem. People using screen readers and keyboards catch the rest.

Before you ask for a quote

What Drives the Cost?

Unique Templates

They set the size of the audit, the biggest line. When vendors scoped port sites of 44, 183 and 801 pages, two estimated about 22 to 26 templates on each; a third counted 14 to 17.

Documents

The driver you control. Even small port websites carry very different document loads, from 10 PDFs to over 4,000. Count yours, or ask for your free report.

Forms and Outside Systems

Payments, forms and bookings. Ask your vendor.

Upkeep

Every year after.

Not on the list: page count. An automated scan is essential, but it's the lowest-cost step for many ports.

What it will cost

The Official Number, and What Vendors' Pricing Says.

1 · The Justice Department

$17,600

for a typical special district over ten years, in today's dollars. About $2,100 a year.

DOJ final rule, 89 FR 31320 (April 24, 2024), Tables 13–15.

2 · The SBA's Office of Advocacy

“Advocacy believes that the DOJ has underestimated the compliance costs and burden hours.”

SBA Office of Advocacy, comment letter to DOJ, October 17, 2023.

3 · What vendors estimated

$1,500 to $17,000

for an independent audit of one site, from a few key pages to a full site.

Vendors' pricing, September and October 2026. Planning estimates, not quotes. I don't represent or endorse any vendor.

Year-One Estimates for Every Port Website, Built From Vendor Pricing

I counted the public pages, templates and documents on Washington's 68 port websites in September and October 2026 and priced year one for each. Each estimate adds four things: scan and fix (my estimate of developer time), an independent audit (scaled from three vendors' estimates for three real port sites; for the smallest sites, published prices for a sampled audit), the documents still in use (at state-contract rates), and a year of upkeep (my estimate). Not included: captions for meeting videos, outside systems, hosting and tax. Each bar below is one port. Names aren't shown; your port's own numbers come with its free report.

Year-one cost estimates by size of website: lowest to highest estimate, and the median (half the ports cost less, half more)
Size of websiteLowest to highestMedianPorts
Up to 10 pages$4,900 to $24,500$6,000 to $13,70010
11 to 25 pages$5,700 to $41,900$6,500 to $15,90016
26 to 50 pages$9,300 to $85,100$14,200 to $32,70023
Over 50 pages$17,900 to $155,900$26,500 to $66,40019
All ports$4,900 to $155,900about $13,000 to $31,00068

Planning estimates, not quotes, and not a ranking or a comment on any port's site: website work plus documents still in use. All 68 port websites priced: about $1 million to $2.6 million together. Each size group shows its lowest and highest estimate; the red bar is its median, where half the ports cost less and half more. For one small port the documents couldn't be counted (its documents page was unavailable), and one small port's site couldn't be re-measured (the site seems to be down), so its October 6 measurement is used. Small-site counts matched hand checks closely; large sites are rougher.

My advice

Three Levers That Bring the Cost Down.

1

Check Templates, Not Pages

An audit tests each page layout once, and every page built on it benefits. Fewer templates means a smaller audit and less to keep up. Ask how many templates your site really needs.

Audits count templates, not pages

Bars drawn to one scale: 801 pages is the longest.

Port A

44 pages

22–26 templates

14–17 templates

Port B

183 pages

22–26 templates

14–17 templates

Port C

801 pages

22–26 templates

14–17 templates

Grey: pages a scanner sees. Red: templates to audit, two vendors' estimate. Outlined: a third vendor's count, 14–17.

Vendors' estimates, October 2026.

2

Turn New PDFs Into Web Pages

The middle port posts about 39 new documents a year, mostly agendas, minutes, notices and press releases. Published as accessible web pages, they skip the fixing a PDF needs. Fix the old ones still in use, and train whoever posts.

Archived documents can stay as they are only if they're old, unchanged, kept only for reference, and in a clearly labeled archive area. Even then, if someone needs one, you still owe them effective communication, so ask your counsel.

28 CFR 35.201(a).

The website is small. The paperwork isn't.

One port

10 PDFs

10 pages

Another

1,926 PDFs

21 pages

A third

4,034 PDFs

55 pages

25,025 PDFs across 48 small and medium port websites.

PDF files linked from each site, counted September 28, 2026.

For standard documents at standard turnaround, most state-contract rates I checked (DES 02024) run about $2.50 to $6 a page. Public agencies buy from it after signing the state's contract usage agreement, so check your port's eligibility with DES.

Washington DES contract 02024, Exhibit B.

3

Repair or Rebuild, Depending on Size

Small sites, up to 25 pages, are the clearest case for rebuilding. Medium sites are a toss-up that turns on templates and the quote. Large sites are even at best in year one; a rebuild pays off later, with fewer templates to test and keep up. Documents cost the same either way.

Repair fits a recent site on a platform you're keeping, when a scan comes back mostly clean. I build websites, so I'm not neutral here. Get both quotes.

Year one, by size of website

Small · up to 25 pages
Up to 10 pages: $4.9K–$24.5K
11 to 25 pages: $5.7K–$41.9K
Rebuilding most often makes sense.

Medium · 26 to 50 pages
$9.3K–$85.1K
A toss-up. Get both quotes.

Large · over 50 pages
$17.9K–$155.9K
Rebuilding rarely wins in year one. It can pay off later, in lower upkeep.

The same year-one ranges as the chart above, all 68 port websites. Planning estimates, not quotes.

Whoever you hire

Five Questions for Any Vendor.

  1. Who does the testing, and with what?
    A scan is the start. Ask whether people test with screen readers and keyboards, and which tools they use.
  2. What's not included?
    Check whether documents, outside systems and the retest are in, and get the list.
  3. Can I see a sample report?
    A useful report names each problem, where it is and how to fix it. A sample shows you whether your team could act on it.
  4. Who fixes what you find?
    Some vendors test and report; some fix too. If they don't, the fixing falls to your staff or your web partner.
  5. Will you answer my email in a week?
    It sounds like a joke. It isn't: follow-through was a big factor in how I judged the vendors I talked to this fall.

Get the answers in writing.

Where to start

Your 18-Month Work List.

Now to January 2027

Name an owner. Count pages and documents. Run a free scan. Stop posting new PDFs.

Staff time

February to June 2027

Choose help with the five questions. Fix templates and forms.

Small port: about $3,000 to $7,000
Mid-size port: about $4,000 to $10,500

July to December 2027

Fix the documents still in use, newest first. Test with real people.

Small port: about $2,000 to $5,000
Mid-size port: about $8,000 to $19,000

January to April 2028

Retest. Post an accessibility statement and a way to report a barrier. Keep a dated test record. Plan for ongoing training.

Upkeep begins · April 26, 2028

The ranges shown are medians for small ports (up to 25 pages) and mid-size ports (26 to 50 pages): planning estimates, not quotes. Put a range in your 2027 budget. The Justice Department said in 2024 that it doesn't run a grant program for ADA compliance, and I found no dedicated state fund.

89 FR 31376 (2024).

Start with the owner. If everyone's in charge, no one is. Then ask your vendors for their VPAT, and write WCAG 2.1 AA into each contract when it renews.

One option, if it fits

The Accessibility Foundation Rebuild.

$2,500

For port sites up to about 25 pages, not counting news posts or meeting records. Larger sites, or extras like payments and booking, get a custom quote.

Included:
  • Your site rebuilt on up to 8 checked templates, with two forms
  • An accessibility statement and a report-a-barrier link
  • A meeting-records template, so agendas and minutes go up as web pages
  • Training for whoever posts
  • Automated scanning, and fixing what it finds, through build and launch, at no extra cost
Not included:
  • Testing with real people (the independent audit)
  • Fixing documents
  • Outside systems
  • Hosting and ongoing monitoring
A clean build should make that testing cost less.

Rather talk it through?

Send us a note below.

Ask about your port, the Foundation Rebuild, or anything in this research. Or book a free consultation.